21-06: 2021 Street Reconstructions

Project Location

  • Club West Parkway NE from 109th Avenue NE to Cloud Drive NE
  • 93rd Lane Extension to approximately 350-feet east of Anoka County-Blaine Airport Gate A to 85th Avenue NE
  • 100th Court NE from Flanders Court NE to cul-de-sac
  • Flanders Court NE from Radisson Road NE to 100th Court NE
  • 105th Lane NE from National Street NE to Sunset Avenue

Project Description

The proposed project includes four separate street segments within the City of Blaine. The descriptions and scope of construction for each of these segments are described below.

Club West Parkway NE

This proposed segment will reconstruct Club West Parkway NE (MSAS 130) from 109th Avenue NE (CSAH 12) to Cloud Drive NE. Proposed improvements include bituminous pavement replacement with spot curb replacement, renovation to the existing roundabout located at 113th Avenue NE to include a raised truck apron, reconstruction of the west leg at 111th Avenue NE to reduce the grade break, street sign replacement, and appurtenant construction. The scope of storm sewer improvements includes construction of additional catch basins in order to meet state aid spread requirements and adjustment of surface features. Additional catch basins are primarily proposed at the existing low points however an extension of the storm sewer near the northern limits of the project is proposed to meet spread requirements. Minimal water and sanitary sewer improvements are defined as part of this project, including water gate valve and sanitary sewer manhole replacement.

93rd Lane Extension

This proposed segment will reconstruct 93rd Lane Extension (MSAS 125) from approximately 350-feet east of Anoka County Airport Gate A to 85th Avenue NE (Anoka County CSAH 32, Ramsey County CSAH.  Proposed improvements include bituminous pavement replacement with spot curb replacement. The scope of storm sewer improvements is limited to the adjustment of inlet castings and manholes. Minimal water and sanitary sewer improvements are defined as part of this project—improvements are limited to adjustments of surface features.

100th Court NE and Flanders Court NE

This proposed segment will reconstruct Flanders Court NE from Radisson Road NE (CSAH 52) to 100th Court NE and 100th Court NE from Flanders Court NE to the cul-de-sac. Proposed improvements include bituminous pavement replacement with spot curb replacement. The scope of storm sewer improvements is limited to the adjustment of inlet castings and manholes. Water improvements include replacement of hydrants and adjustment of other surface features. Sanitary sewer improvements are limited to replacement of manhole castings.

105th Lane NE

This proposed segment will reconstruct 105th Lane NE from National Street NE to Sunset Avenue (County Road 53). Proposed improvements include reconstructing the existing bituminous pavement and addition of concrete curb and gutter. The scope of storm sewer improvements include extension of the existing storm sewer further west; adding additional catch basins at the low point to supplement the existing catch basins; and adjustment of surface features. Minimal water and sanitary sewer improvements are defined as part of this project—improvements are limited to adjustments of surface features and replacement of hydrants.

Project Documents

Feasibility Report (PDF)
Location Map (PDF)