Commercial Construction

This section applies to projects for businesses, apartments, airport buildings, and all other occupancy types and work covered by MN Rules, Chapter 1305.  

Building Codes in Effect
  1. How many sets of plans are required for submittal?
  2. Do plans need original signatures or are electronic signatures okay?
  3. Do plans need to be embossed by an Architect and Engineer?
  4. What is the current review period for drawings?
  5. What is the current review period for responses to the building department comments?
  6. Is express plan review available?
  7. Do permit drawings need to be submitted to any additional departments such as Fire Marshal, State Review, etc.?
  8. Is a demolition permit available prior to the building permit? If so, what are the requirements?
  9. Does a General Contractor need to be awarded prior to submittal for permit?
  10. Does the General Contractor and/or subcontractor’s names need to be stated on the permit application for the submittal to be accepted and plan review to begin?
  11. If yes to above, do General Contractor or subcontractor licenses need to be provided at the time of submittal?
  12. Are insurance certificates or bonds required at the time of submittal? If so, by whom?
  13. Are separate applications required by the subcontractors? If so, by whom?
  14. Is landlord approval required for submittal? If so, at permit submittal or at permit issuance?
  15. Can we receive our permit without the landlord’s work being completed and approved?
  16. Are low voltage permits required?
  17. Are low voltage permit applications required at the time of building permit submittal for the release of the building permit?
  18. Do Fire Alarm and Sprinkler drawings need to be submitted with the building permit application?
  19. Do the Fire protection subcontractors need to prepare drawings, cut sheets, and calculations for building permit submittal?
  20. Can the submittal be mailed in?
  21. If the submittal is to be made in person, can we use an expeditor?
  22. Does the building department work with any specific expeditors?
  23. Is the G.C. specifically required to submit the drawings?
  24. Is a plan check fee do at the time of permit submittal?
  25. Are permit fees due at the time of submittal or permit pick up?
  26. Are there any additional fees that we should be aware of?
  27. Current building codes being used:
View All