16-12: Reconstruction of Restwood Road and Flowerfield Road

Project Location


Restwood Road from Naples Street to North Highway Drive and Flowerfield Road from Naples Street to North Highway Drive.

Project Description


Proposed reconstruction includes reconstruction of existing street section to a 3-1/2 inch bituminous pavement over 4-6 inches of reclaimed aggregate base material, installation of concrete ribbon curb on Restwood Road and concrete curb and gutter on Flowerfield Road, installation of storm sewer, catch basins and culverts.

Project Status

 
Project has been substantially completed, there will be some curb replacement and turf establishment done yet this summer.  An assessment hearing will be scheduled for late summer and notices will be mailed at that time.  