Solar System
- Step 1 - Review and Prepare
- Step 2 - Create an Account/PRO
- Step 3 - Apply
- Step 4 - Review and Payment
- Step 5 - Schedule an Inspection
Review and Prepare
-
The following documents need to be available for upload during the online application process. Please note, all documents need to be in a PDF format.
- Plans and Job Specifications
Along with uploading PDFs of plans and required submittals, two (2) full-size hard copies of all submittals is also required prior to plan review. - Civil/Utilities Plans
Along with the PDF upload of civil/utilities plans, one (1) additional hard copy set is required when there is underground utility work prior to plan review. - SAC Determination Form
This is to be turned into the Metropolitan Council 651-602-1421 (Required prior to issuance of permit). - Sub-Contractor Contact List
Required to be completed on the online application prior to permit issuance.
Hard Copy Delivery
Deliver/mail hard copies of plans and other submittals to:
Blaine City Hall
Attn: Building Inspections10801 Town Square Drive NEBlaine MN 55449
Please include a cover sheet with the following information:
- Permit Number (B20-00xx)
- Project Address (if known)
- Contact Information
Please note that any additional submittals of revisions must be by both hard copy and PDF upload into the IMS permit. - Plans and Job Specifications
Create an Account/PRO
-
Are you a new user?
Create an Account
New users to the system need to create an account. Please select create an account.
Having trouble creating an account? Detail instructions are available:
Already have an account?
Create a PRO Account
A PRO account is for contractors that require any city or state license or registration.
Please note, Architects are able to apply for a permit for new commercial buildings without being a PRO account.
Online Application
Once you have gathered or emailed the necessary documents, you are ready to begin the online application process.
Please note the following:
- Once the application is started, the system will not allow you to go back to a previous page, you must continue through the entire application.
- Once you have completed and uploaded all required documents, a review page allows you to go back and edit any part of the application.
- Any question or upload with a red asterisk (*) is required.
Review and Payment
-
-
Review time is up to 15 business days.Please note, during the busy construction months and with the online software launch, delays may occur.
-
After completion of the permit review, an email with permit cost and payment instructions will be sent.
- After receipt of payment, a hard copy of the approved plans will be ready for pick up at:
Blaine City Hall
Attn: Building Inspections
10801 Town Square Drive NE - Blaine MN 55449
- Inspection scheduling can start.
Please note, the approved plans must be on the job site for all inspections.
-
Schedule an Inspection
-
- When scheduling inspections, please plan at least three to four business days ahead.
- Please note, during the busy construction months longer delays may occur.
-
Information needed before calling to schedule an inspection:
- Permit number.
- Address for the job site.
- Inspection type.
- If you are the homeowner, the name of contractor doing the work is needed.
- Login to IMS Account and go to your dashboard.
Enlarge Image
- On your Dashboard, go to My Inspections.
- A list of required inspections can be viewed along with the instructions on how to schedule.
General Information
- A separate electrical permit is required through the MN State Board of Electricity.
Documents
-
iMS Help Building Inspections
Phone: 763-717-2794, Option 1
-
Building Inspections
Physical Address
10801 Town Square Drive NE
Blaine, MN 55449
Phone: 763-785-6170Fax: 763-785-6111