| 11-08: Northeast Wellfield Study | |
| 14-09: Blaine Wetland Sanctuary | North of 109th Avenue and West of Lexington Avenue |
| 14-11: Reconstruction of 105th Avenue from TH 65 to Radisson Road | Reconstruction of road including trail and sidewalk on both sides. |
| 15-19: Water Tower No. 1 Reconditioning | Rehabilitation of existing water tower, including repainting and minor structural repairs. |
| 15-21: Reconstruction of County Road 10 Service Drive from Jefferson Street to Able Street | |
| 15-22: Reconstruction of Hastings Street from 85th AVenue to Cul-de-sac | The proposed project will reconstruct Hastings Street from 85th Avenue to the cul-de-sac. |
| 16-12: Reconstruction of Restwood Road and Flowerfield Road from Naples Street to North Highway Drive | |
| 16-14: Reconstruction of Pheasant Ridge Drive and Lexington Avenue Intersection | |
| 16-15: Dunkirk Street Storm Sewer Repair | The project consists of removing existing bituminous pavement and aggregate base and storm sewer pipe, installation of storm sewer, water main and sanitary sewer new bituminous pavement on the 9100 block of Dunkirk Street. |
| 17-05: Reconstruction of Jefferson Street from 104th Court to 119th Avenue | |
| 17-07: Lever Street Improvements from 125th Avenue North to 132nd Avenue Alignment | |
| 17-09: 113th Avenue Trunk Sanitary Sewer | |
| 18-02: 2018 Seal Coat Program | |
| 18-03: 2018 Pavement Markings | |
| Anoka County Project: CSAH 51 (University Avenue) from 97th Avnue to 105th Avnue | Concrete curb and gutter, and storm sewer structure restoration. |